
Concrete, bricks and tiles
Skip Bins for Heavy Materials
Concrete, bricks, roof tiles, blocks and sand are heavy. Talk to the team before you book so the load is right from the start.
Call before you book
Contact Ozzie before booking a skip for heavy materials. Call 0487 360 094. Roof tiles, bricks and concrete are a separate waste category with restricted volumes, because these materials reach a bin's weight limit long before it looks full.
Weight limits in our 3m³, 4m³, 6m³ and 8m³ Builders & Renovators Bins may restrict the amount of concrete, tiles, bricks, blocks and/or sand that can be placed in the bin. The team will talk through the job and the right way to handle it.
What Typically Goes In
- Concrete (restricted volume)
- Bricks and blocks (restricted volume)
- Roof tiles (restricted volume)
- Floor and wall tiles (restricted volume)
- Sand (restricted volume)
Keep Out or Check First
- Always contact the team before booking for any of these materials.
- Never fill a bin with heavy material to the rim. Weight is the limit, not space.
- Asbestos cannot go in any bin. Older roof and wall sheeting may contain it.
- Soil and rubble mixes: ask the team first.
- Tree stumps are not accepted in Builders & Renovators bins.
Published prices
Prices for This Job
Builders and Renovators Bins
Builders waste pricing, with 14-day hire included.
- 3m³
- $330
- 4m³
- $380
- 6m³
- $520
- 8m³
- $600
Weight limits in our 3m³, 4m³, 6m³ and 8m³ Builders & Renovators Bins may restrict the amount of concrete, tiles, bricks, blocks and/or sand that can be placed in the bin.
Delivery and transport fees. Pricing includes delivery for the Coffs Harbour area. Transport fees apply for areas outside the Coffs Harbour area. Contact the team to confirm.
Why heavy materials are handled differently
Every bin is sized by volume, but it also has a weight it can safely carry. With light waste, you run out of space first. With concrete, bricks, tiles and sand, you run out of weight first, sometimes with most of the bin still empty.
Skip trucks also have legal load limits. A bin that is too heavy may not be safe or legal to lift and carry, which is why the team needs to know about heavy loads before the bin is sent.
Never overload or overfill
It can be tempting to top up a bin with a few more bricks. Please do not. Loading beyond what was agreed can mean the bin cannot be collected as planned.
Bins must not be filled above the rim. Transporting an overfilled skip bin is an offence, and an additional fee of $80 may apply to overfilled bins. Builder mixed waste over the allowance is charged at $38.00 per 100 kg.
What to tell the team
A quick call on 0487 360 094 sorts it out. Have these details ready.
- The material: concrete, bricks, roof tiles, blocks, sand or a mix.
- Roughly how much, for example the area of a slab or the length and height of a wall.
- Whether it is mixed with lighter waste.
- Where the bin will go and any access restrictions.
Choosing a size
Suggested Skip Bin Sizes
3m³
450 kg included
A compact option for smaller amounts of heavy material, where weight runs out before space. Ask the team first.
4m³
600 kg included
Low 0.9 m sides make heavy material easier to load by hand. Ask the team how much it can take.
Excess Weight
- Builder mixed waste
- $38.00 per 100 kg
- Green waste
- $23.00 per 100 kg
Charged only on weight above the allowance included with the bin.
Other Charges
- Overfilled bins
- $80
- Mattresses and bed bases
- $42 per item
- Additional hire
- $20 per day
May apply if a bin is filled above the rim.
Charged in addition to the bin hire.
Applies after the included hire period for your waste type.
Up to 7 days
General waste hire included
Up to 14 days
Builders waste hire included
$20 per day
After the included hire period
Please do not overfill. Bins must not be filled above the rim. Transporting an overfilled skip bin is an offence, and an additional fee of $80 may apply to overfilled bins.
Questions
Heavy Materials: FAQs
Can I put concrete in a skip bin?
Yes, but volumes are restricted by weight. Contact the team on 0487 360 094 before booking.
Why can I not fill the bin with bricks?
Bricks are very heavy for their size. A bin full of bricks could exceed the weight that can be safely and legally lifted and carried, so the amount has to be limited.
Which size suits heavy materials?
Ask the team. For heavy loads the weight limit matters more than capacity, so a bigger bin does not always mean more material. The team will recommend a size for your job.
Can old roof tiles go in the skip?
Roof tiles are a published category with restricted volumes, so contact the team first. Asbestos cannot go in any bin, so if old roof or wall sheeting may contain it, have it assessed by a licensed professional before removal.
What happens if the bin is too heavy?
Excess weight is charged, and builder mixed waste is $38.00 per 100 kg over the allowance. A bin that is too heavy may also not be able to be collected safely. See the skip bin weight limits guide.
Related Skip Bin Services
Popular Service Areas

Book your bin
Ready to Book Your Skip?
Send through your details and the team will confirm your bin, your delivery day and anything you need to know before we arrive. Prefer to talk it through? Give us a call.
